AI Kuari

Asphalt Plant

Fuel per tonne, mix temperature and baghouse health.

Asphalt batch mix plant loading a truck with hot mix

Fuel per Tonne

Burner fuel per tonne, hour by hour.

Mix in the Window

Mix temperature checked against the specification window.

Baghouse Health

Filter pressure drop tracked before it becomes an emission.

Thermal View.

Whole Chain
Asphalt plant mixer tower, visible view
Asphalt plant mixer tower, thermal view
S1 : 158.4°C S2 : 146°C S3 : 176°C S4 : 118°C

Mixer Tower

Mix discharge must sit between 145 °C and 163 °C.

  • S1 Mix Discharge
  • S2 Tower Casing
  • S3 Tower Top Outlet
  • S4 Dryer Drum Shell

Illustration. Temperatures are sample values within the limits VYROX Quarry checks.

The Devices.

Other Stages.

Runs on VYROX Quarry.

Alarms, work orders and reports from the same readings.