AI Kuari

Stockpiles

Tonnes, days of cover and survey drift, by product.

Conical aggregate stockpiles with a stacker and a survey drone

Stock by Product

Tonnes per pile from belt scales and surveys.

Days of Cover

How long each pile lasts at today's rate of draw.

Rain and Moisture

Rain and moisture readings point to the driest pile.

The Devices.

Other Stages.

Runs on VYROX Quarry.

Alarms, work orders and reports from the same readings.